Facilities Update 8|8|16

Our facilities team is hard at work this summer getting everything ready for the upcoming school year! Here’s what the team has been working on in the last week, and don’t forget to check out the gallery below!

High School:

  • New carpet and furniture was installed.
  • Weight room weights were installed.
  • Weight room painting and floor installation is complete.  Small touch up painting scheduled for next Monday.
  • Weight room HVAC work is in progress for the new air handling unit.
  • Main gym wood floor is getting re-sanded.
  • Practice fields turf by the sprinkler heads are being touched up.
  • Drainage work by sidewalk areas.

 

North Middle School:

  • Installed a smart chemical feeding system in the pool area.
  • Exterior wall and brick work.

 

Ben Franklin:

  • New soccer fence and soccer field sod was installed by playground area.
  • Drainage work was complete by the sidewalk (part of the playground project).

 

Valley View:

  • Ceiling grid and some lighting has been installed.
  • Bathroom floor and wall tile is being installed.
  • Drywall studded wall was installed in the cafeteria/music room area (sound and climate control issue).
  • Roof work is near completion.

 

Riverside:

  • Ceiling tile grid and some lighting has been installed.
  • Bathroom floor and wall tile is being installed.
  • Building automation controls installation is in progress.
  • The parking lot was sub floor was stabilized on Tuesday.

This slideshow requires JavaScript.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s